Implementation of PLTS in Flood Disaster Mitigation System in Pabuaran Village, Kemang district, Bogor Regency

Penerapan PLTS pada Sistem Mitigasi Bencana Banjir di Desa Pabuaran Kec. Kemang Kab. Bogor

Authors

  • Galuh Ika Pratama Putri Universitas Pamulang
  • Ojak Abdul Rozak Universitas Pamulang
  • Hafiz Nabil Nurwahid Universitas Pamulang
  • Hedy Aditya Baskhara Universitas Pamulang
  • Anto Carmanto Universitas Pamulang

DOI:

https://doi.org/10.57152/consen.v3i2.1024

Keywords:

Rainfall, Flood Mitigation, PLTS Off-Grid

Abstract

Bogor City has 70% humidity and rainfall is predicted to start in November 2023, so a community service activity was carried out in Pabuaran Village, Kemang Kec. Bogor Regency to make a tool to detect flood disasters (flood mitigation). However, because in Pabuaran Village the distance from the public electricity line from PLN is very far, finally a Solar Power Plant (PLTS) was made using an Off-Grid system to supply flood mitigation tools. By using the implementation method, this PLTS has a power of 100Wp to drive a flood mitigation tool that requires a voltage supply of 12VDC which is accommodated using a battery that has a voltage of 12V. By using PLTS, the implementation of PKM has no obstacles and has been realized according to the fulfillment of system energy supply as the goal.

 

Downloads

Download data is not yet available.

References

ADI WIKANTO. (2023). No Title. KONTAN.CO.ID. https://amp.kontan.co.id/news/resmi-dari-bmkg-ini-prakiraan-musim-hujan-tahun-2023-november-mulai-musim-hujan

Aji, E. P., Wibowo, P., & Windarta, J. (2022). Kinerja Pembangkit Listrik Tenaga Surya (PLTS) dengan Sistem On Grid di BPR BKK Mandiraja Cabang Wanayasa Kabupaten Banjarnegara. Jurnal Energi Baru dan Terbarukan, 3(1), 15–27. https://doi.org/10.14710/jebt.2022.13158

Harahap, P. (2019). Implementasi karakteristik arus dan tegangan plts terhadap peralatan trainer energi baru terbarukan. Seminar Nasional Teknik (SEMNASTEK) UISU, 2(1), 152–157.

Junas Haidi, Hendy Santosa, & Alex Surapati. (2022). Pembuatan Alat Pendeteksi Banjir di Sungai Kawasan Wisata Desa Rindu Hati Bengkulu Tengah. Dinamisia?: Jurnal Pengabdian Kepada Masyarakat, 6(2), 410–418. https://doi.org/10.31849/dinamisia.v6i2.8161

Naim, M. (2020). Rancangan Sistem Kelistrikan PLTS Off Grid 1000 Watt di Desa Leoha Kecamatan Towuti. 12(01), 17–25.

Rozak, O. A., Irwansyah, N., Aditya, H., & Heri, B. (2023). Implementasi Sensor Photocell sebagai Sistem Penerangan Otomatis untuk.

Rusli, M. R., Pradigta, L., Raharja, S., Nugraha, S. D., & Firyal, A. (2023). Battery-Based Energy Storage System from Solar Panels Utilization for Worship House Applications in Carang Wulung Village Sistem Penyimpanan Energi Listrik Berbasis Baterai dari Pemanfaatan Panel Surya Untuk Aplikasi Rumah Ibadah di Desa Carang Wulung. 7(5), 1190–1197.

Setyawan, A., & Ulinuha, A. (2022). Pembangkit Listrik Tenaga Surya Off Grid Untuk Supply Charge Station. Transmisi, 24(1), 23–28. https://doi.org/10.14710/transmisi.24.1.23-28

Tangga, T. R. (2022). Pembangkit Listrik Tenaga Surya (PLTS) Sebagai Solusi Energi Terbarukan Rumah Tangga. 06(02), 136–142.

Unjuk, A., Pembangkit, K., Tenaga, L., Plts, S., Setiawan, I. K. A., Kumara, I. N. S., & Sukerayasa, I. W. (2014). SATU MWp TERINTERKONEKSI JARINGAN DI KAYUBIHI , BANGLI. 13(1), 27–33.

Downloads

Published

2023-11-30

How to Cite

Pratama Putri, G. I., Abdul Rozak , O. ., Nabil Nurwahid , H. ., Aditya Baskhara, H. ., & Carmanto, A. . (2023). Implementation of PLTS in Flood Disaster Mitigation System in Pabuaran Village, Kemang district, Bogor Regency: Penerapan PLTS pada Sistem Mitigasi Bencana Banjir di Desa Pabuaran Kec. Kemang Kab. Bogor. CONSEN: Indonesian Journal of Community Services and Engagement, 3(2), 142-146. https://doi.org/10.57152/consen.v3i2.1024